March 13, the frost is out of the ground and it's extra muddy, we stripped the forms, looks like a great pour, no honeycomb, Started the back-fill process, loaded in 3 loads of 3" minus crush for inside of the foundation, The electrician arrived about 2:00 PM to install the electrical conduit and wire us for temp power from the existing house using the power from the hot tub on the upper deck.