On Thursday March 16 we hauled in two more loads of radon rock and compacted the material with the 1000 lb plate tamper.  The radon gas barrier was installed and all protrusions were sealed with red tuck tape and acoustic seal.  The 10 mm steel reinforcing steel bars were installed and DOS inspected the work at 12:30 and passed the inspection.  A pleasure to work with the District of Summerland.